EVM EnLumina Wireless Bluetooth Speaker up to 12 hours playtime with RGB Lights, Built-in Mic - Music Control Buttons and Bluetooth 5.3 EVM-BTS-201
from
Upto
-55%
₹1,260.00
₹2,799.00
- Stock: 10
- Brand: EVM
- Model: EVM-BTS-201
Total Views: 1021
Seller Name: Rishabh mobile
For International buyers, orders are shipped and delivered through registered international courier companies and/or International speed post only. For domestic buyers, orders are shipped through registered domestic courier companies and /or speed post only. Orders are shipped within 0-7 days or as per the delivery date agreed at the time of order confirmation and delivering of the shipment subject to Courier Company / post office.More info..
Please make sure you meet the following requirements before sending the goods back for replacement.
Please Before purchasing the products, read the warranty and warranty terms carefully.
सभी उत्पादों के लिए वारंटी कवरेज का उल्लेख वारंटी अनुभाग में उत्पाद विवरण पृष्ठ पर किया गया है। यदि उत्पाद पर लागू वारंटी है, तो कवरेज विवरण के नीचे अवधि का भी उल्लेख किया गया है।
ज्यादा जानकारी के लिए more info. पर क्लीक करें
More info..
⚙Specification & info
| Color | |
| Color | black |
| compatibility | |
| COMPATIBLE WITH | party, yoga, picnic |
| PLAYBACK TIME | |
| PLAYBACK (MUSIC) | 12h |
| RANGE NETWORK AREA | |
| RANGE/COVERAGE | 20m |
| TECHNICAL | |
| BATTERY BACKUP | 1200mAh |
| in the box (in packaging) | |
| In The Box | 1 piece speaker, 1 piece charging cable |
| Extra | |
| MANUFACTURER & IMPORTER | Rishabh Mobile |
| MANUFACTURER WARRANTY | YES |
| REPLACE BY SELLER | YES |
| ORIGIN | |
| MADE IN - MADE BY | INDIA |
PRODUCT DETAIL INFO
- EVM EnLumina Wireless Bluetooth Speaker
- Enjoy up to 12 hours of continuous playback with the 2000mAh battery, perfect for all-day use.
- RGB Lights & Built-in Mic: Enhance your music experience with dynamic RGB lights and take hands-free calls with the built-in microphone
- Bluetooth 5.3 & 12W Output: Experience seamless connectivity and powerful sound with Bluetooth 5.3 and dual 6W speakers for a total of 12W RMS output
- FM Radio & Music Controls: Tune into your favorite FM stations and easily control your music with dedicated buttons for play, pause, skip, and volume.
- Compact & Lightweight Design: Measuring 17 cm (H) x 10.2 cm (W) x 14.5 cm (D) and weighing just 450 grams
- this speaker is portable and easy to carry.